Underwater Tasks
At OQSG, we understand that certain underwater tasks just aren't the same as their topside counterparts, so we created our Underwater Tasks Course Library. These tasks are designed to meet or exceed the DOT requirements for Operator Qualification for Underwater Covered Tasks. We worked side-by-side with divers to create rich course content with animations, diagrams and real-world examples so your employees not only meet the requirements, but also retain the information they've reviewed, resulting in fewer mistakes and less accidents.
Underwater Courses

- CT01U - Cathodic Protection Inspection on Underwater Facilities
01U.1 Prepare & calibrate test equipment
01U.2 Take & record CP readings
01U.3 Abnormal operating conditions - CT02U - Prevention of External Corrosion on Underwater Pipelines
02U.1 Inspect Existing Coatings
02U.2 Perform Surface Preparation
02U.3 Repair Coatings and Application
02U.4 Abnormal Operating Conditions - CT03U - Measure Wall Thickness of Underwater Pipe
03U.1 Prepare & Calibrate Test Equipment
03U.3 Measure Pit Depth and Diameter using a Pit Gauge
03U.2 Measure Wall Thickness Using Ultrasonic Testing Methods
03U.4 Abnormal Operating Conditions - CT04U - Conduct Underwater Cathodic Protection Remediation
04U.1 Install Galvanic Anodes on Submerged Pipeline or Facilities
04U.2 Abnormal Operating Conditions - CT05U - Conduct Temporary Marking of Underwater Pipelines
05U.1 Locate Pipeline
05U.2 Determine Pipeline Depth
05U.3 Install Temporary Pipeline Marker
05U.4 Abnormal Operating Conditions - CT06U - Conduct Underwater Valve Inspection, Maintenance and Repair
06U.1 Identify Valve Types & Components
06U.2 Conduct Visual Inspection of Valves & Flanges
06U.3 Identify Maintenance Procedures
06U.4 Repair Valve as Instructed
06U.5 Abnormal Operating Conditions - CT07U - Movement of In-Service Underwater Pipeline
7.1 Move In-Service Pipeline
7.2 Conduct Inspection of Pipeline for Secondary Stresses, Physical Damage and Coating Damage
7.3 Abnormal Operating Conditions - CT08U - Abandoning, Safe Disconnect, Purging and Sealing of Underwater Pipelines
8.1 Purge Pipeline
8.2 Safely Disconnect Pipeline
8.3 Seal Disconnected Segment of Pipeline
8.4 Bury Disconnected Segment of Pipeline
8.5 Abnormal Operating Conditions - CT09U - Installation, Replacement or Repair of Support Structures on Underwater Components
9.1 Replace or Repair Support Structures on Existing Underwater Components
9.2 Install Additional Underwater Support Structure Elements to Components
9.3 Abnormal Operating Conditions - CT10U - Inspection of Underwater Pipeline Facilities
10.1 Conduct General Pipeline Inspection
10.2 Inspect Pipeline Crossings
10.3 Inspect Flanged Tie-ins
10.4 Inspect Repairs
10.5 Inspect Support Structures
10.6 Abnormal Operating Conditions - CT11U - Perform Underwater Pipeline Repair Activities
11.1 Excavate Pipeline
- CT12U - Operation of an Underwater Assembly
12.1 Manually Operate Valves on an Underwater Assembly
12.2 Abnormal Operating Conditions - CT13U - Perform Underwater Pigging Activities
13.1 Perform Basic Launching Procedures
13.2 Perform Basic Receiving Procedures
13.3 Abnormal Operating Conditions - CT14U - Perform Underwater Flange Mating Procedures
14.1 Perform General Flange Assembly Procedures (Make-up)
14.2 Perform General Flange Disassembly Procedures (Break-out)
14.3 Abnormal Operating Conditions - CT15U - Perform an Underwater Hot Tap
15.1 Remove Coating
15.2 Conduct Pipeline Quality Checks
15.3 Install Hot Tap Fitting
15.4 Operate tool and remove coupon
15.5 Repair Coating and Bury Pipeline as Required

